SUMMARY:EGO Computing Maintenance and Computing Room UPS Replacement
DTSTART:20260326T070000Z
DTEND:20260407T160000Z
DTSTAMP:20260501T015600Z
UID:indico-event-7@indico.igwn.org
DESCRIPTION:Short description\nPlanned maintenance of the EGO computing in
 frastructure\, including staged computing updates\, UPS replacement activi
 ties\, and progressive service restart. The intervention will affect authe
 ntication\, detector computing\, storage\, core user services\, and networ
 k availability over the maintenance window.\nCurrent status\n\nOverall sta
 tus: ONGOING \nLast updated: [30 March 2026\, 16:00\, CET]\n\n \n- After
 noon of March 25th: \n\nDetector Hardware in safe mode\nAll Virgo applica
 tion stopped\nDAQ shutdown (Collection\, Storage\, Access) (\n Cm and VPM
  processes shutdown\n17:30 CET: Computing maintenance activities are in pr
 ogress.\n\n \nMorning of March 28th:\n\nComputing infrastructure updates 
 are ongoing as planned and in some areas are in advance\nShutdown window o
 n Monday\, March 30 is confirmed as planned\n\n \nAfternoon of March 30th
 :\n\nPair of temporary generators has been installed\nAs planned\, computi
 ng core services shutdown started at 12:00\nUPS Electrical shutdown starte
 d at 13:30 and finished at 15:45\nComputing Center is being powered by gen
 erators\nEGO IT team is restoring core services \n\nContacts during the s
 hutdown\nFor urgent issues during the shutdown windows\, please use the al
 ternative contacts below\, as the EGO mail service may be unavailable.\nPh
 one contacts\n\nFranco Carbognani: +39 3669826503\nComputing support: (L. 
 Salconi) +39 3428090890\nInterferometer Operation  (V. Dattilo): +39 3292
 274503\nEGO Administration: +39 3470749281\n\n \nAlternative email addre
 sses\n\nfcarbogn@gmail.com\n\nDuring the shutdown windows\, updates on ser
 vice status and recovery progress will be published on this Indico page.\n
 Description\nFollowing the planned computing outage at EGO\, this event pr
 ovides the consolidated schedule and expected service impact for the infra
 structure update and UPS replacement activities.\nTo reduce downtime of us
 er-facing services during the UPS intervention\, a pair of generators will
  be used to provide temporary power coverage during part of the work. As a
  consequence\, Core Services\, Network\, and Auth (IPA) will only be shut 
 down during two specific daytime windows:\n\n30 March\, from 12:00 until l
 ate evening\n2 April\, from 12:00 until late evening\n\nOutside these wind
 ows\, core services may be available\, but throughout the shutdown period 
 services may still degrade because of dependencies and ongoing upgrades.\n
 Overall timeline\n\n26–29 March: progressive computing infrastructure up
 dates\n30 March – 2 April: UPS replacement activities\n3 April: restart 
 phase begins\n7 April: completion of full system recovery\, including dete
 ctor-related services\n\nMain impacts\nCore services\, network\, and authe
 ntication\nThe following services are expected to be unavailable during th
 e scheduled shutdown windows on 30 March afternoon and 2 April afternoon\,
  and may degrade outside those windows during the intervention period:\n\n
 websites\nmail\nmailing lists\nlogbook\nwifi\nnetwork\nvmd\netmd\nwikies\n
 indico\nvdi\ntds\ntimestamps\nmeeting rooms\nadmin software\npurchase sw\n
 git / mattermost ET\nteam speak\nAuth (IPA)\n\nEmails sent to EGO addresse
 s while mail is unavailable will be queued and delivered after restoration
 .\nDetector computing and storage\nThe following services are affected ove
 r the longer maintenance window\, from 26 March to 7 April:\n\nfarmn\nctrl
 \nolservers\nhtcondor\nmass storage (/data)\nstol (daq data)\nrtpc\ndms\nw
 eb scientist\nfile server (/virgoxxx)\n\nThese services should be consider
 ed unavailable for most of the maintenance period until progressive recove
 ry is completed.\nRecovery\n\nFrom 3 April: progressive restart of service
 s begins\nBy 7 April: full restoration expected\n\nImportant note\nThe sch
 edule may still evolve depending on work progress and unforeseen technical
  issues.\nServices Availability Matrix\nDate                    
 | Auth (IPA)    | Detector Computing | Storage (/data) | Core Services (
 mail\, web\, etc.) | Network----------------+-------------------+---------
 -----------+---------------------+----------------------------------+-----
 ----Mar 26                | may degrade       | DOWN      
          | DOWN                | may degrade           
               | may degradeMar 27                | may degr
 ade       | DOWN               | DOWN                |
  may degrade                          | may degradeMar 28  
               | may degrade       | DOWN               
 | DOWN                | may degrade                    
       | may degradeMar 29                | may degrade      
  | DOWN               | DOWN                | may degrade
                           | may degradeMar 30 morning  | may
  degrade      | DOWN               | DOWN              
   | may degrade                          | may degradeMar 30
  afternoon| DOWN                 | DOWN               | D
 OWN                | DOWN                           
          | DOWNMar 31                | may degrade      | D
 OWN               | DOWN                | may degrade   
                       | may degradeApr 01              
    | may degrade    | DOWN               | DOWN          
       | may degrade                           | may degra
 deApr 02 morning   | may degrade    | DOWN               | DOW
 N                | may degrade                        
   |may degradeApr 02 afternoon| DOWN                | DOWN    
            | DOWN                | DOWN              
                       | DOWNApr 03                 | r
 estarting          | restarting         | restarting        
     | restarting                               | restart
 ingApr 04                 | recovering        | recovering  
        | recovering          | recovering                
               | recoveringApr 05                 | recover
 ing        | recovering         | recovering          | reco
 vering                              | recoveringApr 06   
               | recovering        | recovering         | r
 ecovering          | recovering                         
      | recoveringApr 07                 | OK            
          | OK                     | OK             
         | OK                                      
      | OK\n \n \n\nhttps://indico.igwn.org/event/7/